Cebu City mayor renews call for water supply dam project

0
CEBU CITY PIO

CEBU City Mayor Michael L. Rama renews his request to the national government to build a dam for a reliable and sustainable water supply after the citys distributor last week announced a plan to increase prices by 70% from July 2023.

This question highlights what I asked, which is to build a dam that would collect heavy rainfall so that a surplus of supply means lower rates for consumers,Mr Rama said in a statement on Friday.

Citing a presentation from the Metropolitan Cebu Water District (MCWD), he said the planned tariff adjustment would mean a 60% increase by July 2023 and 10% by July 2024.

The mayor noted that he originally proposed the dam project earlier this year after the city was among the hardest hit areas by Typhoon Odette in mid-December last year.

Let’s refresh such a project. As we first raised with President (Rodrigo R.) Duterte after (Typhoon) Odette hit us hard, we will bring this project to the attention of President BBM (Ferdinand R. Marcos, Jr. ) for the national government to pour out its resources and help to achieve it,he said.

The proposal also included the construction of surface water retention systems as part of the national governments recovery aidTowards the city.

Rama has also instructed the city’s Bureau of Agriculture to work on building gabion dams in remote parts of the city, which would help slow the flow of water in canals or ditches. of rain runoff.

He said it was part of targeted accomplishments within his administration.s first 100 days from July 1st.

He also directed the city council to hold public consultations on the MCWDs expected rate hike.

The mayor also asked the MCWD to reevaluate its proposal and implement the increase over a longer period.

I ask the MCWD Board to reconsider its plan to impose a new tariff and consider seeking adjustments, only if it must, in a staggered manner to spare consumers any adverse effects until 2025 ,he said.

MCWD, a government-owned and controlled standalone company, last raised its rates in 2015.

Water districts are regulated by the Local Water Utilities Administration, including rate setting.

The utility is currently constructing a 1.1 billion peso bulk water supply project, which is expected to be operational by September.

Cebu City, the regional center of the Central Visayas in the central Philippines, is part of the Cebu Metropolitan Region, which is the second largest urban district in the country after the capital region, Metro Manila. MSD


Source link

Share.

Comments are closed.